Jim Moran Foundation Topping Out

55f9b3a5-dc96-4cd4-965c-43eed921aaa1
On Friday, May 31, we celebrated a significant milestone at the Jim Moran Foundation: the topping out of their new headquarters. This event marks a major step forward in the construction of a state-of-the-art, 63,000-square-foot facility designed by HASTINGS.

The five-story building is a connected two-volume structure that features large open floor plates and varied components that include office and program space, shared event space, and archives exhibits. Exterior surfaces and porches are clad in warm neutral panels while glazing is framed in dark bronze curtain walls partially shielded with metal screens. Engineered bamboo soffits within the building invite connection between interior and exterior; and human-scaled textures and materials reinforce the timeless nature of the design.

We are proud to be part of this transformative project and look forward to seeing its positive impact on the community.
IMG_2187 copy
IMG_2219 copy
IMG_2212 copy

Architecture, Interior Design, Planning, and Sustainability

Architecture, Interior Design, Planning, and Sustainability